翻訳と辞書 |
Hangzhou–Changsha High-Speed Railway : ウィキペディア英語版 | Hangzhou–Changsha High-Speed Railway
Hangzhou–Changsha High-Speed Railway is a Chinese high-speed railway connecting the provincial capital of Zhejiang, Hangzhou with the Jiangxi capital of Nanchang and Hunan's capital, Changsha. This railway forms a section of the Shanghai-Kunming High-Speed Railway, part of the National Railway Grid Network, as one of the four major east-west lines. It has a total length of 921.426 kilometers. Constructuon started in December 2009 and was opened to traiffic on December 10, 2014. With trains from Hangzhou to Nanchang taking 2 hours 14 minutes, Hangzhou to Changsha in three hours and 36 minutes. ==Route== The route from east to west starts at Hangzhou East or alternatively at Hangzhou, Hangzhou South, Zhuji, Yiwu, Jinhua, Longyou, Quzhou, Jiangshan, Yushan South, Shangrao, Yiyang, Yingtan North, Fuzhou East, Jinxian South, Nanchang West, Gao'an South, Xinyu North, Yichun, Pingxiang North, Liling East, for a total of 21 stations when it reaches Changsha South.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Hangzhou–Changsha High-Speed Railway」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|